To clear log jams from rivers and streams to minimize streambank erosion and debris hazards downstream.
Details
• Identify locations of interest.
• Secure landowner approvals for access
• Remove large trees that have the potential to impact the dam or move down the river channel out of easement elevation or burn.
• Smaller twigs, sticks, small trees, and sediment that has collected, will be placed to stabilize the streambank
• Slope banks to allow for easy flow of water and reduce erosion.
Priority
4
Mitigation #
LPMA0016680
Status
New
Project Lead
Ashland County SWCD, ODNR, USACE, Vendor/Contractor