LHMP : Champaign County 2019 Hazard Mitigation Plan
Local Hazard Mitigation Plan - Mitigation Action
Title
4.17 County
Details
The County will require developers and/or construction crews in urban development zones to use tools such as chemical stabilization, compost blankets, geotextiles to control soil deterioration, mulching of new plantings, seeding and sodding of areas highly vulnerable to rapid surface runoff, installation of grass lined channels, slope diversion for surface runoff, and other methods to reduce the damages to land and property due to heavy and rapid surface runoff or drainage from rainfall or other precipitation or draining water.